Sunday, 24 January 2021

Bug Life Cycle / Defect Life Cycle In Software Testing

 Bug:- When actual results deviate from the expected result while testing a software application or product.


Bug Life Cycle:- In the software development process, bug have a life cycle. The bug should go through the life cycle to be closed.



New:- When the tester finds a bug and posting the first time then the status of the bug is new.

Assign:- once bug assigned to development team then status of the defect is assign.

Open:- When the development team starts the analysis and works on the defect fix then the status is open.

Fixed:- When developer make necessary code change the verified, then status will be changed as fixed.

Test:- If the defect is fixed and ready to test then the status tests.


2 comments: